View All Photos
This 8 acre blank canvas located next to the new AWS Data center at 2335 Echo Rd offers an array of possibilities for a savvy developer. This site could be the ideal location for a Battery Energy Storage System located adjacent to the Amazon Data Power Substation. This location could support a 300MW-1450 MWH modular BESS in time for the scheduled 2028 startup for at least 4 hours during a total outage of the power grid. Climate change and residential demand can force a 24/7 300MW facility to shave the peaks, fill the troughs and provide instantaneous power back-up response well ahead of the power grid still under construction. Note that the core of Georgia Power's 10GW expansion at Plant Wansley is not scheduled to be online until 2029-2031to serve all new data centers under construction in Georgia. If recent history is a prediction of the future, the planned power expansion can be subject to lengthy delays. A BESS can also provide nearby residents peace of mind from the noise of emergency power generators within the AWS Data campus for short duration emergency power requirements.
The data relating to real estate for sale on this web site comes in part from the Broker Reciprocity Program of GAMLS. All real estate listings are marked with the GAMLS Broker Reciprocity thumbnail logo and detailed information about them includes the name of the listing brokers. The broker providing these data believes them to be correct, but advises interested parties to confirm them before relying on them in a purchase decision. Copyright 2023 GAMLS. All rights reserved.
Provided By
Listed by John L. Atkinson (#ATKINSONJOHN)
Listing Office: Atkinson & Associates Realty (#ATKN01)

Get an estimate on monthly payments on this property.